14473 | Construction of Lions Gate Bridge
Construction of Lions Gate Bridge
Alexis MacKintosh
2001, 21st century
27 x 40 cm
14473
This artefact belongs to: © Alexis MacKintosh/Vox Veritas Pictures
Description
Keywords:
Keys to History
Amazingly, most of the bridge-replacement work took place at night so that the daily flow of 70,000 vehicles could continue uninterrupted. The decision to follow this complex timetable -- thought to be the first such plan in the world -- indicates the bridge's importance as a transportation link. American Bridge/Surespan, a joint venture, won the $86.5-million contract to execute this logistical feat. During the work, the bridge was closed daily from 8 p.m. to 6 a.m., as well as on a few weekends. Forty-seven deck sections, about 20 m long and weighing 106 t, were progressively installed from north to south. A jacking traveller provided the continuous link on the bridge, besides lifting and lowering the sections. The job took one year, from the night of September 9 to 10, 2000, to the night of September 29 to 30, 2001. Completed without major traffic disruptions, it was hailed as a tremendous engineering success.
-
What
This nighttime close-up shows a bridge section being lowered down to a barge in order to be replaced.
-
Where
The piece in question is deck section 23, located in the middle of the span.
-
When
Since the jacking traveller is in the middle of the span, the photo was likely taken halfway through the year of replacement work -- in the spring of 2001.
-
Who
Photographer Alexis Mackintosh took this picture from a helicopter as part of her assignment with Air Digitale to document the bridge-replacement work.